News

Redmond Group proud of mechanical services installed on British Land project

Redmond Group is proud to have provided the mechanical services on this prestigious development at Clarges Estate and for this key customer, British Land. Redmond Group delivered works on this project in two separate stages, firstly to the Plant Room and the secondly to the 33 high-end luxury apartments. Works included the installation of:

  • Low Temperature Hot Water (LTHW) and Chilled Water (CHW) pipework in the plant room
  • Low Temperature Hot Water (LTHW) and Chilled Water (CHW) to the fan coil units
  • Low Temperature Hot Water (LTHW), Chilled Water (CHW) and Domestic Services to the apartments
  • Installation of new domestic water services including new Kemper valve system
  • Crimped fittings above ceilings with brazed fittings utilised on pipework drops behind marble walls
  • Free-issue sanitary ware

All pipework on this project was prefabricated off site and installed in a timely manner.